Total Pageviews

Monday 14 October 2019

Previous Work Done

14 October 2019

From the invoices supplied with the car here is a list of some of the major work up and until purchase by me. I have not gone back beyond 1990 as a full body restoration in 1993 and a new engine in 2005 will have superseded much work done previous to that time.

In reverse order:-

February  2019    - New door/armrests and new sun visors.
July 2018              - New clutch pipe, slave cylinder and flex hose. New bottom radiator hose.
June 2018             - New 12v battery with 3 year guarantee.
November 2009   - Waxoyl rustproofing all over ( over £400 spent).
August 2009        - Near rear armature plus fittings.
November 2005  - Ivor Searle replacement engine fitted.
August 2005       - Exchange front brake covers, callipers & pads. Fitted LH front bearing kit.
November 2004  - Replacement HIFR carbs.
March 2004        - New fuel pump, new brake cylinders and pads.
December 1998  - KN air filters added.
October 1998     - Seats recovered. (not clear what with?)
September 1998 - Alloy rocker cover added.
August 1995       - New wiper motor & blades.
March 1993        - Full body restoration.
September 1993 - New steering wheel.
September 1993 - New stainless steel exhaust fitted.
October 1992     - Engine ,gearbox & overdrive remove and overhauled.
February 1992   - New water pump.
January 1990     - New petrol tank.

Clearly there are some large gaps, 2009 to 2018 in particular.  Any more information would be much appreciated.

I will add to the list as information becomes available.

No comments:

Post a Comment

Third Brake light

September 2022 Fitted additional third brake light (3BL) inside rear screen.  Soldered on bullet connectors to live and earth wires supplied...